
Économie - 26 juillet 2026
Rwanda and Tanzania Review Bilateral Cooperation
DAR ES SALAAM, Tanzania, July 26, 2026 - Foreign Minister Olivier Nduhungirehe met Tanzania’s Foreign Minister Mahmoud Thabit Kombo to review ways of strengthening bilateral relations. Rwanda’s delegation included Gisa Teta, head of Africa at the Foreign Ministry, and…
DAR ES SALAAM, Tanzania, July 26, 2026 - Foreign Minister Olivier Nduhungirehe met Tanzania’s Foreign Minister Mahmoud Thabit Kombo to review ways of strengthening bilateral relations.
Rwanda’s delegation included Gisa Teta, head of Africa at the Foreign Ministry, and Ambassador Gen.
This detail was included in the mid-to-late July RWANDA briefing.
The discussions took place against the backdrop of President Kagame’s May visit to Tanzania and President Samia Suluhu Hassan’s subsequent Kigali visit, with trade, transport, investment and East African Community cooperation remaining central areas of engagement.
À lire aussi

Économie - 31 juillet 2026
Contractor Given 21 Days to Finish Delayed Wakiso Roads
Wakiso, Uganda, July 31, 2026 - State Minister for Kampala and Metropolitan Affairs Kabuye Kyofatogabye gave Jilk Construction Company three weeks to complete two late World Bank-funded GKMA-UDP roads in Makindye-Ssabagabo-the 1.8-kilometre Municipal Extension Road and…
Par Amina Kabasele - 2 min de lecture

Économie - 31 juillet 2026
Pakistan ratifies MoUs with Rwanda on trade cooperation
The partnership will be implemented through Pakistan’s “Look Africa” development initiative. The agreement will be used to establish mechanisms to promote trade between the two countries, including the establishment of a joint Pakistan-Rwanda trade group, regular high-level…
Par Sarah Ndaya - 2 min de lecture

Économie - 31 juillet 2026
Rubanda Councillors Demand End to Samcrete Bunyonyi Road Contract
Rubanda, Uganda, July 31, 2026 - District councillors urged the Ministry of Works and Transport to terminate Samcrete Egypt Engineers and Contractors over the deteriorating Kabale-Lake Bunyonyi tourism road. They said the contractor abandoned sections after preliminary works,…
Par Amina Kabasele - 2 min de lecture
